Tuesday, September 9, 2014

TIAM: Need to pick up some speed.

A1 is now done.  It's only half a sheet and it's mostly recolors, but it still has waterfalls, decorations for the water and it's all animated.  If I finish everything else I want to do with this set and still have some time I'd like to add more to it, maybe a canal or ocean or something.  I got done everything I had intended for it though, so I'm moving on!


As awesome as it is to cross off an entire sheet, I've become much too lazy in my approach on this.  Getting so little done each day isn't enough to get me a finished set by the end of the month.  It's time to get recommitted and get myself into a schedule that will get me where I need to be.

I haven't heard back from Despain yet so for now I'm moving forward as though I'm not going to have any characters in this pack.  I figure to get back on track I'll need to do this every day:

26 B tiles
3 Autotiles
9 A5 tiles
1 item with animation
1 bonus item (anything from icons to battle backs)

The scariest thing is, this plan has no wiggle room left.  To put some back in (because I always need it) I'll have to do even more than that each day.  I have no idea how I'd fit characters back in if I need to.  I may be doomed.  Oh well, nothing for it but to roll up my sleeves and get to work!

1 comment:

  1. You aren't doomed, because oing something is so much better than nothing. Go you! :D

    I'm so glad you are feeling better.

    ReplyDelete